Defrost
DEFROST TIMING
When power is first applied to the system, its timer starts counting time. If 4 defrost are
programmed, it will initiate a defrost every 6 hours from when power was first applied.
Beacon II does not have a real time clock. Beacon II does provide the ability to delay the
starting of the first defrost.
DEFROST DELAY START TIME
Example: The system is first powered up at 8:00 AM and is programmed for 4 defrost per
day. The user would like the first defrost at 10:00 AM. To accomplish this, use the
PROGRAM REVIEW button to scroll to
dFS
. Use the SELECTOR switch to select 2
hours delay start, then press ENTER. The 1
st
defrost will now occur at 10:00 AM and
then a defrost will occur every 6 hours thereafter.
TIME REMAINING UNTIL NEXT DEFROST (on version 1.8 boards)
To find out how much time is left until the next defrost is scheduled, use the MONITOR
button to scroll to dFS. The time displayed will be how much time until the next scheduled
defrost.
DEFROST SCHEDULE IN MEMORY
Beacon II does not have a real time clock but it keeps track of the time that has elapsed in
its memory. It also keeps in memory the number of defrosts scheduled and how much time
has elapsed between defrosts. If a power failure occurs, when power is restored Beacon II
remembers how many defrosts are scheduled and it remembers how much time was left
until the next defrost. It will then defrost based on this timing. So, if the power failure lasted
15 minutes, the defrost schedule will be off by 15 minutes.
RESETTING DEFROST SCHEDULE
When a power interruption causes a severe lag in the defrost schedule, the defrost
schedule can be reset in the following manner. First, press the reset time button on the
board to zero out the internal counters. Then, program the appropriate defrost delay start
time for the next desired defrost period. The defrost schedule will be correct until you have
another power outage.
Pumpdown / Defrost
Service Mode
A single pole, single throw switch (SPST) is supplied in each condensing unit for shutting
off the system. Closing the Service switch in the condensing unit will cause the system to
pumpdown and shut off. Ser will be displayed on the Beacon board LED and SERVIC is
displayed on the Smart Controller LCD display. The Evaporator Fan and Heaters will be de-
energized in the Service Mode. The system will not restart until the SPST switch is
placed in the NORMAL or OFF position.
or
A remote Service switch can be added to the Beacon II board across the Ser and C
connections of the terminal block. It will operate in the same manner as the switch above.
or
The system can be pumped down by pressing the SERVICE button twice. To restart the
system, press the CLEAR button.
or
The system can be pumpdown for service by closing the Liquid line service valve in the
condensing unit, then closing the suction line service valve when the system trips on the
low pressure switch.
In order for air defrost evaporator fan motors to cycle off during Service mode, the fan
motors must be wired through the fan relay on the Beacon II board.