– 8 –
INSTALLATION
Before installing the fryer, verify that the type of gas (natural or propane) agrees with the specifications
on the fryer data plate, which is located on the inside of the door panel. Ensure the fryer is configured
for the proper elevation.
UNPACKING
This fryer was carefully inspected before leaving the factory. The transportation company assumes full
responsibility for safe delivery upon acceptance of the shipment.
Immediately after unpacking the fryer, check for possible shipping damage. If the fryer is damaged,
save the packaging material and contact the carrier within 15 days of delivery.
Do not use the door or its handle to lift the fryer.
Remove tiedown straps from the burners (Fig. 2).
Fig. 2
PL-41712-1
REMOVE