INSTALLING HOBART OFFICE RESPONSIBILITIES:
Coordinate Assembly and Start up of Oven and Proofer (see details below)
Schedule installation and startup of equipment with Kroger Project Manager
o Over 50 miles from Hobart Service Office is charged on a Time & Materials basis
Remove debris from installation site to dumpster location. GC is responsible for
removal of all debris from property.
First trip will include:
Coordinate installation with the construction supervisor
Explain the electrical, plumbing and venting connections
Uncrate oven and proof box
Move equipment to final location
Assemble the equipment and components and set in place
Coordinate the final hookups with contractor
After notification that final connections are made, Hobart will coordinate a second
trip
Second trip will include:
Verify final hookups
Start-up and adjustments of equipment to manufacturers settings and specifications
Calibrate and make adjustments as needed
Verify all equipment functions and unit is ready for production
Complete installation checklist and forward to Hobart for review and startup of
warranty coverage
Hobart will follow up within 30 days after startup to verify unit is properly operating to
customer satisfaction.
Other installation support available, at additional cost, includes:
Overtime installation
Storage of equipment at service office
Receiving
Unloading
Moving equipment
Special handling through restricted doorways and levels
Perform final hookup of utilities
Removal or disposal of old units in remodel locations