Hobart OV500G2 ML- 132498 Double Oven User Manual


 
OV500 SERIES RACK OVEN - REMOVAL AND REPLACEMENT OF PARTS
14. OV500G1 & OV500G2 oven pull rear of heat
exchanger into the oven cavity. As you slide
rear of heat exchanger, pull heat exchanger to
clear baking compartment to free front of heat
exchanger.
15. Replace heat exchanger tubes and flue sections
as needed.
NOTE: To aid installation of new flue, remove the
four exhaust stack retainers.
16. Reverse the procedure to install.
IGNITION MODULE
1. Open the control compartment door to gain
access to ignition module.
2. Remove control box cover.
3. Disconnect lead wires from the ignition module.
Note Wire locations or refer to wiring diagram.
4. Remove screws securing ignition module to
oven.
5. Reverse the procedure to install.
CONTROLLER
Certain components in this system are
subject to damage by electrostatic discharge during
field repairs. A field service grounding kit is available
to prevent damage. The field service grounding kit
must be used anytime the control board is handled.
1. Open the control compartment door to gain
access to controller.
F25361 (January 2010)Page 21 of 60