Hotpoint HD90X Ventilation Hood User Manual


 
5GB
INSTALLATION
Wall drilling and bracket fixing
Wall marking:
Draw a vertical line on the supporting wall up to the ceiling, or as high as practical, at the centre
of the area in which the hood will be installed.
Draw a horizontal line at 650 mm above the hob.
Place bracket 7.2.1 on the wall as shown about 1-2 mm from the ceiling or upper limit aligning the
centre (notch) with the vertical reference line.
Mark the wall at the centres of the holes in the bracket.
Place bracket 7.2.1 on the wall as shown at X mm below the first bracket (X = height of the upper
chimney section supplied), aligning the centre (notch) with the vertical line (see diagram above).
Mark the wall at the centres of the holes in the bracket.
Mark a reference point as indicated at 116 mm from the vertical reference line and 323 mm above
the horizontal reference line.
Repeat this operation on the other side.
Drill ø 8 mm holes at all the centre points marked.
Insert the wall plugs 11 in the holes.
Fix the brackets using the 12a screws (4,2 x 44,4) supplied.
Insert the two screws 12a (4,2 x 44,4) supplied in the hood body fixing holes, leaving a gap of 5-
6 mm between the wall and the head of the screw.
Mounting the hood body
Before attaching the hood body, tighten the two
screws Vr located on the hood body mounting
points.
Hook the hood body onto the screws 12a
Fully tighten support screws 12a
Adjust screws Vr to level the hood body.
11
12a
323
X
116
1÷2
116
650 min.
7.2.1
12a
Vr