5
INSTALLATION REQUIREMENTS
Tools and Parts
Gather the required tools and parts before starting installation.
Read and follow the instructions provided with any tools listed
here.
Tools needed
■ Level
■ Drill
■ 1¼" (3 cm) drill bit
■ ¹⁄₈" (3 mm) drill bit if installing into wood and a ⁵⁄₁₆" (8 mm) drill
bit if installing optional backsplash kit.
■ Pencil
■ Wire stripper or utility knife
■ Tape measure or ruler
■ Pliers
■ Caulking gun and weatherproof caulking compound
■ Vent clamps
■ Jigsaw or keyhole saw
■ Flat-blade screwdriver
■ Metal snips
■ Phillips screwdriver
■ Scissors
Parts needed
■ Home power supply cable
■ 1 - ½" (12.7 mm) UL listed or CSA approved strain relief
■ 3 UL listed wire connectors
■ 1 wall or roof cap
■ Metal vent system
Parts supplied
Remove parts from packages. Check that all parts are included.
■ 2 metal grease filters for 30" (76.2 cm) models
3 metal grease filters for 36" (91.4 cm) models
4 metal grease filters for 48" (121.9 cm) models
■ Damper
■ Hood canopy with blower and halogen lamps installed.
■ 1 - 10" (25.4 cm) square to 10" (25.4 cm) round duct
transition.
■ 2 - 175 watt infrared heat lamps
■ Wood support
■ Grease collectors
■ 4 - 6 x 80 mm mounting screws
■ 4 - 3.5 x 9.5 mm screws
■ 6 - 4.2 x 19 mm screws
■ 5 - M6 x 16 mm screws
■ 5 - D6.4 x 11 mm washers
■ 2 - D5.3 x 20 mm washers
■ 2 - 10 x 50 mm wall anchors
■ T20
®
TORX
®†
adapter
Location Requirements
IMPORTANT: Observe all governing codes and ordinances.
Have a qualified technician install the range hood. It is the
installer's responsibility to comply with installation clearances
specified on the model/serial rating plate. The model/serial rating
plate is located inside the range hood on the rear wall of the
range hood.
Canopy range hood location should be away from strong draft
areas, such as windows, doors and strong heating vents.
Cabinet opening dimensions that are shown must be used. Given
dimensions provide minimum clearance.
The canopy range hood is factory set for venting through the roof
or through the wall.
All openings in ceiling and wall where canopy range hood will be
installed must be sealed.
For Mobile Home Installations
The installation of this range hood must conform to the
Manufactured Home Construction Safety Standards, Title 24
CFR, Part 328 (formerly the Federal Standard for Mobile Home
Construction and Safety, Title 24, HUD, Part 280) or when such
standard is not applicable, the standard for Manufactured Home
Installation 1982 (Manufactured Home Sites, Communities and
Setups) ANSI A225.1/NFPA 501A, or latest edition, or with local
codes.
Product Dimensions
Front view
†®TORX and T20 are registered trademarks of Saturn Fasteners, Inc.
CL
18¹⁄₁₆" (45.9 cm) for 48" (121.9 cm) Hood
12¹⁄₁₆" (30.6 cm) for 36" (91.4 cm) Hood
9¹⁄₁₆" (23.0 cm) for 30" (76.2 cm) Hood
18" (45.7 cm)
12" (30.5 cm)
30" (76.2 cm)
36" (91.4 cm)
48" (121.9 cm)
2¹⁄₄"
(5.7 cm)
6¹⁄₂" (16.5 cm)
25" (63.5 cm)