Kobe Range Hoods RA3830S Ventilation Hood User Manual


 
5
UNDER THE CABINET INSTALLATION
S AF ET Y W A R N IN G
HOOD MAY HAVE VERY SHARP EDGES; PLEASE WEAR PROTECTIVE GLOVES IF IT
IS NECESSARY TO REMOVE ANY PARTS FOR INSTALLING, CLEANING, OR
SERVICING.
Preparation before Installation
NOTE: TO AVOID DAMAGE TO YOUR HOOD, PREVENT DEBRIS FROM ENTERING THE
VENT OPENING.
- Decide the location of the venting pipe from the hood to the outside. Refer to Figure 1.
- A straight, short venting run will allow the hood to perform more efficiently.
- Try to avoid as many transitions, elbows, and long run as possible. This may reduce
the performance of the hood.
- Temporarily wire the hood to test for proper operation before installing.
- Peel protective film off the hood (if any).
- For installing under the cabinets with recessed bottom, attach 4-inch wide wood filler
strips (not included) on each side. Refer to Figure 2.
- Measure and create access opening for electrical wires under the cabinet.
Figure 1 Figure 2
Hood Installation
CAUTION: If required to move the cooking range to install the hood, turn off the power on an
electric range at the main electrical box. SHUT OFF THE GAS BEFORE MOVING A GAS
RANGE.
1. Puncture the knockout holes. Refer to Figure 3.