Lincoln 1100 Double Oven User Manual


 
Impinger II – Installation & Operation Manual
3
PURCHASER’S RESPONSIBILITY
It is the responsibility of the purchaser:
1. To see that the gas and electric services for the oven are installed on site in accordance with the manufacturers
specification.
2. To unload, uncrate, and install the oven in its proper location; in accordance with this installation / operation
manual.
3. To see that the gas and electric services are connected properly by a qualified installer of your choice. For
installation in the State of Massachusetts: Installation of this oven must be performed by a licensed plumber or
gas fitter. All such connections must be in accordance with applicable code requirements. Refer to “Installation
Codes and Guidelines” section for specific code references.
4. To arrange for inspection and operation check-out by an Authorized Service Technician as described below:
Do not attempt to operate the oven until connection of utility service has been fully inspected by an Authorized
Service Technician or a Lincoln Foodservice Products, LLC Service Representative. This service is required by
Lincoln Foodservice Products, LLC in order to assist the purchaser in proper start-up of the oven on site. Please
note the specific details on the Warranty and make certain that service connections are made to proper utility
services.
The warranty shall not apply if the oven(s) are started up and operated prior to the utilities and oven being
inspected and check out made by an Authorized Service Technician or a Lincoln Foodservice Products, LLC
Service Representative.
TABLE OF CONTENTS
WARNING AND SAFETY INFORMATION……………………………………………….……………………...… 2
PURCHASER’S RESPONSIBILITY……………………………………………………….……………………...… 3
MODEL NUMBER KEY…………………………………………………………………….………………………… 4
UTILITY SPECIFICATIONS – GAS & ELECTRIC……………………………………….…..………………....… 5
EXTERIOR DIMENSIONS…………………...…………………….………….…………………………………….. 6
GENERAL INFORMATION…………………………………………………………………….……………………. 7
UNLOADING & UNCRATING.….……………………………………………………………….………………..…. 7
ASSEMBLY INSTRUCTIONS FOR STAND……………………………..…………………….………………..… 7
STACKING INSTRUCTIONS………………………………………………………..…..………………………….. 8
SPACING REQUIREMENTS……………………………………………………………………………………...… 10
VENTILATION GUIDELINES…………………………………………………………………...…………………... 10
AMBIENT TEMPERATURE REQUIREMENTS…………………….…………………….……………………….. 10
CANOPY VENTILATION RECOMMENDATIONS………………………………………………………………... 11
SMOKE CANDLE TEST PERFORMED AT “START-UP / CHECKOUT”……………...……………………….. 11
UTILITY SERVICE LAYOUT …………..…………………………………………………….……………………... 12
INSTALLATION CODES & GUIDELINES….……………………….……………………….…………………..… 12
PROGRAMMING……………………………...……………………………………………………………………... 13
FUNCTIONS – THERMAL CUT-OUT SWITCH……………………………………………………………….….. 14
RESTRAINT REQUIREMENT……………………………………………………………………………………..... 15
CONVEYOR REMOVAL……………………………………………………………………………..………………. 16
FINGER REMOVAL & DISASSEMBLY……………………………………………………………..……………... 16
CLEANING INSTRUCTIONS…………..………………………………………………………………………….... 17
PREVENTIVE MAINTENANCE……..……………..………………………….……………..………….………….. 18
HOW TO OBTAIN SERVICE………………………….……………………………………………….……………. 18
APPENDIX A: LABEL DEFINITIONS..………………………………………………………………….………….. 19
WARRANTY………………………………………………………………………………………………………...… 21