^
Feed the connection cable down
through the cut-out.
^
Starting at the front, position the
appliance in the worktop cut-out.
^
Using both hands, press down
evenly on the sides of the appliance
until it clicks into position. When
doing this make sure that the seal
under the appliance sits flush with
the worktop on all sides. This is
important to ensure an effective seal
all round. Do not use sealant.
When installing several appliances, a
sealing strip must be fitted into each
spacer bar.
^ Push the appliance to the side until
the long slots in the spacer bar can
be seen.
^
Fit the sealing strip d into the long
slots in the spacer bar b.
^
Starting at the front, position the next
appliance in the worktop cut-out.
^
Connect each appliance to the mains
(see "Electrical connection").
^
Check that each appliance works
correctly.
Once installed, the hob can be
removed using a special tool.
It can also be pushed up out of the
cut-out from below. It must be
pushed up from the back first.
Installing the appliance(s)
36