Miele DA 230-3 Ventilation Hood User Manual


 
^
Position the mounting plate and align
the notches with the guide line.
Mark the position of the four holes to
be drilled a for securing the mount
-
ing plate and determining the posi-
tion of the hole b the power cord will
feed through.
^ Feed the ductwork and power cord
through their respective openings in
the ceiling.
If 6" (150mm) diameter ducting is not
possible then 5" (125 mm) ducting can
be used in conjunction with a reducing
collar available from the Miele Technical
Service Department (see "Installation /
"Air extraction").
^
Drill four
3
/
16
" (5 mm) holes in the ceil
-
ing.
The S10 wall anchors included in the
packaging are not for use in
USA/CDN.
Be certain that the ceiling is stable
enough to support the hood.
Installation
26