Moffat E311 Convection Oven User Manual


 
Electrical Connection
Ensure unit is fitted with appropriate cord and plug.
To access the electrical connection terminal block, grounding lug (marked with green), and strain
relief, remove the back panel (4 screws).
WARNING - THIS APPLIANCE MUST BE GROUNDED
Water Connection (Canada only)
A cold water supply should be fitted to the water inlet which is located on the rear of the left hand
side of the unit.
A connection elbow and sealing washer is supplied with this unit for direct connection of a 1/2” ID
hose, and is recommended for easy installation and service.
Connect water supply - Max inlet pressure 80psi / 550kPa.
Turn on water supply to check for leaks.
Before Use
Operate the oven for about 1 hour at 200°C (400°F) to remove any fumes or odours which may be
present.
Installation
4
Important
:
MAXIMUM INLET WATER PRESSURE IS 80 psi / 550 kPa.