NuTone QT700 Ventilation Hood User Manual


 
FIGURE 7
FIGURE 8
FIGURE 6
DUCTING
1. Refer to Figure 6. Connect the ductwork to damper/duct
connector. Tape all joints with duct tape.
WIRING
NOTE: All wiring connections must comply with local
codes, ordinances and the National Electric Code and
the ventilator must be properly grounded.
1. Loosen screws and remove junction box.
2. Run 120vAC supply wiring with ground through switch box
to knockout in ventilator housing and secure with box
connector.
3. Refer to Figure 7. Connect supply wires to ventilator
wires: black to black, white to white. Connect ground wire
to green ground screw.
4. Replace junction box and tighten screws.
5. Connect supply wire to switch.
NOTE: Switch must be purchased separately. Refer
to NuTone's catalog for complete ordering information.
POWER UNIT INSTALLATION
1. Reinstall the power unit and tighten the hex nuts securely
to assure minimum sound levels.
2. Plug in blower.
GRILLE INSTALLATION
Install the grille using the screws provided.
MAINTENANCE
Disconnect the power before cleaning or performing any
maintenance on the ventilator.
If the grille becomes dirty, use only a mild soap and water
solution for cleaning. Do not use solvents or abrasive
cleaners.
BLACK
GREEN
GREEN
GROUND
SCREW
SWITCH
BOX
EARTH
GROUND
120vAC, 60 Hz
HOUSE POWER
DO NOT INSTALL ABOVE OR INSIDE
THIS AREA
FLOOR
COOKING
EQUIPMENT
45° 45°
COOKING AREA
STANDARD
WALL SWITCH
WHITE