Perlick US4KP Beverage Dispenser User Manual


 
General Information
Preparing the Floor
Snap a chalk line on the building floor to establish
cooler location. Place floor panel(s) on the floor and
check for level. A level floor is essential to ensure
that vertical panels will be plumb. If shimming
is required to level the sections, the shims must
extend under the entire section, not just the edges.
Shims should be used at each end, at all wall
seams, and at each floor seam. They should not be
spaced further than 24 inches apart.
Assembly
1. Place (do not slide) all sections into position.
2. Each panel is numbered on the edge. For a four
keg cooler, follow the assembly order on page
5. For a ten keg cooler, the assembly order
appears on page 6.
Note: If ceiling height in building is restricted,
panel(s) can be carried through the door open-
ing and placed into position from inside the
cooler.
3. Install cap plugs in all cam-lock holes.
4. Seal cooler to the floor.
4
Form No. Z2026
Rev 01.28.09
FLOOR PANEL
SEAL COOLER TO FLOOR
AFTER UNIT IS LEVEL AND
ASSEMBLED
CEILING
KEEP GASKETS
OUT OF GROOVE
FLOOR
Perlick is committed to continuous improvement. Therefore, we reserve the right to change specifications without prior notice.