USER MANUAL | 11
wall hood installation
step 3
Install grease filter
step 2
Install chimney
♦ Take off protective laminate coating
♦ Place the chimney on top of range hood base
♦ Make sure the chimney is facing the correct
direction (the vertical vent should be on the
top)
♦ Secure the lower portion of the chimney to the
base of the hood
♦ Attach the chimney to the ceiling mounting
bracket
♦ Screw the chimney into place on both sides
♦ Now the chimney is secured to the ceiling and
wall
♦ Peel off any protective tape or film.
♦ Pop spring loaded filter into place
♦ That’s it! Now you’re ready to try out your new
range hood