Proline PLFW543 Ventilation Hood User Manual


 
8 |
PROLINE
ranGe HooDs
preparation
inspect range hood
1. Check contents of box:
chimney
ceiling bracket
range hood
flexible duct
small bag of hardware
2. Test
plug in and test controls, lights, fan
inspect for any damage during shipping
you must report any damage to Proline within 7 days for a refund
tools you’ll need
power drill
screwdrivers
drill bit
tape measurer
marking pencils
duct tape aluminum backed
level
wall anchors (Make to buy the right kind. Hardware stores can help)
prepare ductwork
Ductwork should already be punched through celling (or the wall if ceiling is not
an option) and ready to hook up to the range hood before beginning installa-
tion. See venting requirements on page 7 of this user manual.
If you are not venting to the outside of your home, be sure to install your
charcoal filters before mounting the hood to the wall. See information on char-
coal filters on page 5 of this manual.