Proline PLFW543 Ventilation Hood User Manual


 
User manUal | 11
wall hood installation
step 3
Install grease filter
step 2
Install chimney
Take off protective laminate coating
Place the chimney on top of range hood base
Make sure the chimney is facing the correct
direction (the vertical vent should be on the
top)
Secure the lower portion of the chimney to the
base of the hood
Attach the chimney to the ceiling mounting
bracket
Screw the chimney into place on both sides
Now the chimney is secured to the ceiling and
wall
Peel off any protective tape or film.
Pop spring loaded filter into place
That’s it! Now you’re ready to try out your new
range hood