Rangemaster 63000EX Ventilation Hood User Manual


 
- 5 -
INSTALL SUPPORT SYSTEM
1. At hood location, install 2 x 4 cross framing
between ceiling joists using dimensions
shown.
2. Finish the ceiling surface. Be sure to mark
the location of the ceiling joists and cross
framing.
3. Position the support frame so that the
support frame opening is on the long side
of the hood.
4. Secure the support frame to joists and cross
framing with four screws provided. Make sure
screws are driven into center of joists and
framing for maximum strength.
5. Adjust the overall height of the support frame.
Loosen and re-tighten the screws in the
height adjustment slots as necessary. Note
that the hood height is 10-1/4” and that the
bottom of the hood must be 24” min. and 30”
max. above the cooktop.
CEILING
JOISTS
TOP VIEW OF
SUPPORT FRAME
CROSS FRAMING
SUPPORT
FRAME
OPENING
HEIGHT
ADJUSTMENT
SLOTS
SUPPORT
FRAME
10
7
/8
7
13
/16
7
13
/16
TYPICAL SUPPORT FRAME MOUNTING
CONNECT DECORATIVE FLUE
1. Secure the upper flue to the upper support
frame with the mounting screws.
2. Insert the lower flue moving it completely
towards the top and fix it temporarily with
retaining screws.
LOWER
FLUE
UPPER FLUE
MOUNTING SCREWS
INSERT THE LOWER
FLUE AND FIX IT
TEMPORARILY