Adjustments
Bridge Thickness - For the Service Tech Only
1. Push and hold Off till the machine stops.
2. Remove evaporator cover.
3. Remove curtain.
4. Use a hex wrench and rotate the bridge
thickness adjustment screw in 1/8 turn
increments CW to increase bridge thickness.
Rotate CCW to decrease bridge thickness.
Caution: Do not make the bridge too thin or the
machine will not harvest properly. Bridge thickness
adjustments are not covered by warranty.
5. Return curtain and evaporator cover to their
normal positions.
6. Push and release the On button. Check next
harvest of ice. Repeat steps 1-6 if needed.
Water Purge Setting
The water purge is factory set to automatically
adjust the amount of water purged per cycle. The
setting can be changed to one of 5 manual settings
or left on automatic.
Purge
setting
1 - Minimum
2-
Moderate
3-
Standard
4 - Heavy 5 - Maximum A - Automatic
Water
Type
RO water or
equivalent,
TDS less than
35
Low TDS
non-RO
water
Setting for
typical
water
High TDS
water
Very High
TDS water,
greater than
256
Factory setting,
suitable for any
water with
conductivity not
less than 10
microSiemens/cm.
To set:
1. Switch the machine OFF by holding the Off
button in until a number or the letter A shows
on the display.
2. Press and release the On button repeatedly
until the number on the display corresponds to
the desired setting.
3. Press and release the Off switch again to
return to the normal control state.
July 2006
Page 17
C0522 through C1030
Remote Condenser Models - User Manual
Ice Bridge Thickness Check
Bridge Thickness Adjustment Mechanism
Too Big Too SmallJust Right,
small cube
1
/
8
-
3
/
1
6
"
b
r
i
d
g
e
Just Right,
med cube