Smeg C9GGSSA Range User Manual


 
Instructions for the installer
8
3.2 Electrical connection
Make sure the voltage and the cross-section of the power supply line match the specifications indicated
on the identification plate positioned in the storage compartment.
Do not remove this plate for any reason.
If the appliance is connected to the power supply network by means of a fixed connection, install a
multipolar cut-out device on the power supply line, with a contact opening distance equal to or greater
than 3 mm, located near the appliance and in an easily reachable position.
Connection to the power supply network may be fixed or with a plug and socket. In the latter case the
plug and socket must be suitable for the cable employed and conform to the regulations in force.
Regardless of the type of connection, the appliance must be earthed. Before connection, make sure that
the power supply line is suitably earthed. Avoid the use of adapters and shunts.
1 - For operation on 220-240V~: use a H05V2V2-F type three-core
cable:
3 x 1.5 mm²
WARNING: THE VALUES INDICATED ABOVE REFER TO THE CROSS-SECTION OF THE
INTERNAL CONDUCTOR.
Warning: only some of the 90 cm models can be connected with two or three phases.
3.3 Room ventilation
The room containing the appliance should have a permanent air supply in accordance with the
regulations in force. The room where the appliance is installed must have enough air flow for the regular
combustion of gas and for the air exchange needed in the room itself. The air vents, protected by grills,
must be suitably dimensioned in compliance with the current regulations and positioned so that no part
of them is obstructed.
The cooker must be kept adequately ventilated in order to eliminate the heat and humidity produced by
cooking: in particular, after prolonged use, you are recommended to open a window or to increase the
speed of any fans.
3.4 Extraction of the combustion products
The combustion products must be extracted by means of hoods connected to a natural draught chimney
whose efficiency is certain or via forced extraction. An efficient extraction system requires precision
planning by a specialist qualified in this area and must comply with the positions and distances indicated
by the regulations. When the job is complete, the installer must issue a certificate of conformity.
1.5 mm
2
20 mm
220-240V~