Sub-Zero BI-48SD Refrigerator User Manual


 
16
|
Sub-Zero Customer Care 800.222.7820
BUILT-IN REFRIGERATION
Plumbing
The water supply line should be located within the shaded
area shown in the illustration below. The water supply line
should be connected to the house supply with an easily
accessible shut-off valve. Do not use self-piercing valves.
The water supply line must not interfere with installation of
the anti-tip brackets.
A reverse osmosis system can be used provided there is
constant water pressure of 35–120 psi
(2.4–8.3 bar) supplied
to the unit at all times. A copper line is not recommended
for this application.
Installation must comply with all applicable plumbing codes.
PLUMBING REQUIREMENTS
Water Supply
1
/4" OD copper, braided
stainless steel or PEX tubing
Pressure 35–120 psi
(2.4–8.3 bar)
Excess Line for Connection 36" (914)
Electrical
The electrical supply should be located within the shaded
area shown in the illustration below. A separate circuit, ser-
vicing only this appliance is required. A ground fault circuit
interrupter (GFCI) is not recommended and may cause
interruption of operation.
Installation must comply with all applicable electrical codes.
ELECTRICAL REQUIREMENTS
Electrical Supply 115 VAC, 60 Hz
Service 15 amp
Receptacle 3-prong grounding-type
75
1
/2" (1918)
FROM FLOOR
7"
(178)
E
6"
(152)
RIGHT SIDE
OF OPENING
Electrical supply location.
3" (76)
18" (457)
6" (152)
RIGHT SIDE
OF OPENING
AREA EXTENDS
1
/2" (13)
FORWARD ON FLOOR
Water supply location.