8
Brewing Coffee - Programming Delay Timer
1. Follow steps 1 — 6 in BREWING COFFEE — IMMEDIATE START
and 1-3 in PROGRAMMING THE MILL.
2. Be sure clock is set to the current time (see SETTING THE CLOCK
instructions on Page 6).
3. Press and hold the Timer Button, ,until the Timer Light appears
and the display reads 12:00. Use the Hour and Minute Buttons,
and , to set the desired programmed time. A small dot will appear
in the upper left corner of the display to signify A.M. No visible dot
indicates P.M.
4. The timer display will flash 5 times then switch back to the current
time of day. Press and release the Timer Button, . The pro-
grammed time is now set and the Timer Indicator Light will turn on to
indicate the timer has been reset.
NOTE: The programmable function must be reset after each programmed
use.
7
Programming the Mill
NOTE: If you desire a medium grind, your machine is automatically pre-
set to 4 or a medium grind; refer to step 2 below. If you wish to pro-
gram a finer or coarser grind, start with step 1.
1. To set the mill to grind the beans to the desired level of coarseness,
press the Select Button, , to select different coarseness levels.
Seven levels of coarseness are available. Coarseness is deter-
mined by the length of time milled - the longer the time, the finer the
grind the stronger the flavor. Setting 1 will mill the beans for 15 sec-
onds. Setting 7 will mill the beans for 40 seconds. If you do not
select a setting the unit will automatically default to setting 4. Make
sure the Mill Light is turned off.
NOTE: If you wish to use pre-ground coffee instead of whole coffee
beans, press the Mill Button, , and make sure the Mill Indicator
Light is on. If you are using whole coffee beans, then the light
should be off.
2. Press the Power Button, , to initiate the mill and brew process; the
Power Light will turn on. Mill will start. After mill stops, unit will auto-
matically switch to brewing operation. To interrupt milling or brewing
press the Power Button, , and the Power Light will turn off.
CAUTION: Do not open Mill & Brew™ Lid until blades and unit
operation has come to a complete stop.
3. After brewing is complete, remove Carafe from Warming Plate and
serve. Coffee Maker Warming Plate will cycle on and off to maintain
proper coffee temperature for one hour before it automatically shuts
off and the Power Light turns off.
4. Unplug and allow unit to cool for 10 minutes between cycles. Allow
to cool completely before attempting to clean.
WARNING: Warming Plate is hot! Do not touch bottom of Carafe or
Warming Plate during or after brewing.
NOTE: After the unit is turned off or automatically shuts off after one
hour, mill coarseness setting will default to level 4 (medium grind).
Coarseness setting will also default to level 4 in the event of power inter-
ruption.
NOTE: The amount of coffee in the Carafe may be slightly less than the
amount of water placed in the Water Reservoir, since some of the water
is absorbed by the coffee grounds.
Melitta_MEMB1B_W_IB_31-3-07 4/3/07 2:34 PM Page 15