............ www.truemfg.com ............
True Food Service Equipment, Inc.
8 8
SHELVING INSTALLATION / OPERATION
INSTALLATION / OPERATION INSTRUCTIONS
REQUIRED TOOLS:
• Tray Slide
Step 1
Position tray slide to align front to back (level)
with rectangular hole of the standard posts.
Make sure tabs on the back-side of the tray slide
are facing down. Push in and slide down on
both ends so tabs are in the locked position.
(See figure 1).
Note
Make sure that pan slide is level front to back
within the refrigerator or freezer.
Step 2
Repeat procedure with remaining tray slides.
Note
Figure 2 illustrates correct installation of tray slide.
Figure 1
Figure 2
Tray Slide
Tray
Slide