True Manufacturing Company TGU-3F Refrigerator User Manual


 
............ www.truemfg.com ............
True Food Service Equipment, Inc.
4 4
INSTALLATION / OPERATION INSTRUCTIONS
To insure that your unit works properly from the
first day, it must be installed properly. We highly
recommend that your True unit is installed by your
supplying dealer or service company. The cost of a
professional installation is money well spent. Issues
caused by incorrect installation may invalidate your
warranty
Before you start to install your True unit, carefully
inspect it for freight damage. If damage is
discovered, immediately file a claim with the
delivery freight carrier or supplying dealer.
True is not responsible for damage incurred during
shipment.
OWNERSHIP
Adjustable Spanner or Mole Grips
Phillips Head Screwdriver
• Spirit Level
REQUIRED TOOLS
Step 1
The following procedure is recommended for
uncrating the unit:
A. Remove the outer packaging by pulling tri-wall
nails from skid. Remove (4) cardboard corner
pads and dust cover.
B. Inspect for concealed damage. Again,
immediately file a claim with the freight carrier
if there is damage.
C. Move your unit as close to the final location as
possible before removing the wooden skid.
Note: Keys for coolers with door locks are located in
warranty packets.
UNCRATING
INSTALLATION / OPERATION INSTRUCTIONS
Step 2
A. Remove packing material behind cabinet as a
cushion. Carefully lay the unit on its back to
remove skid.
When lifting unit remember to leave the
cabinet upright for 24 hours before
plugging into power source.
B. Remove skid by unscrewing all base rail anchor
brackets. Place skid to the side.
C. Carefully lift cabinet upright.
LOCATING
Removing skid
from bottom of
cabinet.