02/2005 11 www.U-LineService.com
75R, 75WC and 75BEV Models
Leveling Information
Note: It is recommended that the unit is level.
1. Use a level to check the
levelness of the unit from
front to back and from
side to side. Level should
be placed along top edge
and side edge as shown
(see Figure 19).
2. If the unit is not level, adjust the feet on the corners of
the unit as necessary (see
Figure 20
).
3. Check the levelness after each adjustment and repeat
the previous steps until the unit is level. Go on to
8 Install the Unit
.
Installation Tip
If the room floor is higher than the floor in the cut-out
opening, adjust the rear feet to achieve a total unit rear
height of 1/8
"
less than the opening’s rear height. Shorten
the unit height in the front by adjusting the front feet.
This allows the unit to be gently tipped into the opening.
Readjust the front feet to level the unit after it is correctly
positioned in the opening.
Installation of the 75R/75WC/75BEV
1. Plug in the power cord.
2. Gently push the unit into position. Be careful not to
entangle the electrical cord.
3. Re-check the leveling, from front to back and side to
side. Make any necessary adjustments. The unit’s top
surface should be approximately 1/8" below the
countertop.
Grille Installation
1. Locate and remove the grille screw from the cabinet,
using a standard blade screwdriver (or a 1/4"
nutdriver). See Figure 21
.
.
2. Remove the control knob by pulling it away from the
cabinet.
3. Identify the grille screw hole on the grille itself. It is
located toward the top of the middle recessed section
of the grille.
7 Level the Unit
Check
Level
Figure 19
Turn Foot to Adjust
Figure 20
8 Install the Unit
Grille Screw
Figure 21