- 3 -
INSTALLATION, OPERATION AND CARE OF
HEAVY DUTY GAS GRIDDLES
GENERAL
Heavy Duty Gas Griddles are produced with quality workmanship and materials. Proper
installation, usage and maintenance of your griddle will result in many years of
satisfactory performance.
Thoroughly read this entire manual and carefully follow all of the instructions provided
Model Number of Burners BTU/hr Input Rating
924RE, AGE24 2 60,000
936RE, AGE36 3 90,000
948RE, AGE48 4 120,000
960RE, AGE60 5 150,000
972RE, AGE72 6 180,000
INSTALLATION
Before installing, verify that the electrical service and type of gas supply (natural gas or
propane) agree with the specifications on the rating plate located inside the griddle front
panel. If the supply and equipment requirements do not agree, do not proceed with the
installation. Contact your dealer immediately.
UNPACKING
This griddle was inspected before leaving the factory. The transportation company
assumes full responsibility for safe delivery upon acceptance of shipment. Check for
possible shipping damage immediately after unpacking. If the griddle is found to be
damaged, save the packaging material and contact the carrier within 15 days of delivery.
Carefully unpack your griddle and make sure that no parts are discarded with packaging
material. A pressure regulator designed to operate with the griddle has been supplied and
must be installed before the griddle is placed into service (Refer to GAS PRESSURE
REGULATOR INSTALLATION in this manual).