8
Make Electrical Connection
1. Disconnect power.
2. Remove terminal box cover.
3. Remove the knockout.
4. Install the UL- or CSA-listed conduit connector.
5. Run 3 wires, black, white and green (14 AWG) in ¹⁄₂" conduit
from service panel to terminal box.
6. Use twist-on connectors and connect black wires together.
7. Use twist-on connectors and connect white wires together.
C
A
B
A
B
Non-vented (recirculating) installation
1. Assemble the 3 parts of the deflector with 2 screws provided.
The assembled deflector should be sized to fit the width of
the vent cover bracket installed earlier.
2. Connect the deflector to the vent cover bracket using 4
screws provided.
3. Measure length of 8" (20.3 cm) vent needed to connect the
transition to the deflector.
NOTE: Vent should fit up inside deflector 1" (2.5 cm)
minimum.
4. Install vent between the transition and the deflector.
5. Seal all connections with duct tape.
WARNING
Electrical Shock Hazard
Disconnect power before servicing.
Replace all parts and panels before operating.
Failure to do so can result in death or electrical shock.
A
A
B
A. Vent cover bracket width
B. Deflector
A. Vent cover bracket
A. Knockout
B. Terminal box cover
A. Conduit
B. Terminal box cover
C. Conduit connector