Zephyr AHZ-M90ABX Ventilation Hood User Manual


 
www.zephyronline.com
5. Install the plate with the  ange facing
the wall, inside the motor casing: carry
out the instructions at stage 3 in rever-
se order then use the screws provided
to complete installation. (Tot. 12 type
B). (Note! If air is discharged from the
top, rotate the plate and install it in the
opposite direction with the  ange fa-
cing upwards) Fig.5
6. Put the top cover back on.
7. Open the  ap Fig.6
8. With the aid of a slotted
screwdriver, break the
grommet of circular hole
through which the wires
pass. Fig. 7
9. Insert the female connector in the
terminal box already attached to the
hood. Fig. 8A
Installation - External & In-Line Blower Preparation
- 14 -