Zephyr AK8100AS Ventilation Hood User Manual


 
10
www.zephyronline.com
Installation – Installing the Power Pack
1. Install optional AK08xxAS Stainless Steel Liner. Review
manual included with liner for more details.
2. If no liner is used cut out an opening in the bottom of the
cabinet by following the dimensions in FIG 1.
3. Lift Power Pack into opening and ensure locking clip has
locked into position. (locking clip is located on left side of
Power Pack. FIG 2
4. Fasten (2) M4 screws into each long side of Power Pack.
If a liner is used the screws will go through the Power Pack
mounting holes, then the liner and into the wood base.
note: Wood blocking may need to be added to cabinet
base if additional support is needed. see FIG 3 and FIG 4
5. Install duct work and seal with duct tape.
7. Install electrical.
8. Remove all packing materials before using Power
Pack. Switch power on and check for leaks around duct
tape.
9. Install fi lter.
CAUTION: At least two installers are
required due to the weight and size of the
hood.
!
Ductwork
wood base
wood base
2” minimum
secure (2) M4 screws to mounting
holes on each long side of Power Pack
metal or other non
combustible material
D
uctwor
k
wood base
woo
db
ase
2” minimum
FIG 1
FIG 2
FIG 3
FIG 4
locking clip
mounting holes
controls
front view
right side view
Ductwork
cabinet bottom cut-out size
26
7/8
10
5/8
Power Pack
Stainless Steel Liner
C/L
C/L