Zephyr ZRM-E42AS Ventilation Hood User Manual


 
9
 $GGDQGVHFXUHZRRGEORFNLQJminimum 2 x 4RQWRFHLOLQJMRLVWV
2. Fasten top support frame to desired location on ceiling using 4 2” wood screws with washers. The wider
section of the support bracket faces the front of the hood.
3. Determine height requirement and secure bottom support frame to top support frame by using 8 M4*7
VFUHZV2 on each angle bracket
4. Lift hood and align the locking tabs on top of hood with the 3 tab cut-outs on bottom of support frame.
Make sure the 4 threaded posts on top of the hood pass through the holes on bottom support frame.
Slide hood forward to lock into place.
5. Secure hood to bottom support frame by fastening 4 wing-nuts over the 4 threaded corner posts on top of
hood body.
6. Install damper, duct work and electrical.
If using hood in recirculating mode you must install the air
diverter plate before assembling the duct covers. Turn to page 11 for instructions.
1RWH+RRGLVLQWHQGHGWREHPRXQWHGWRD¿QLVKHGFHLOLQJ
Front
2
1
3
6
5
4
Ceiling Joists
Wood Blocking
Top Support Frame
Bottom Support Frame
Hood
CAUTION: At least two installers are
required due to the weight and size of the
hood.
!
WARNING: Electrical wiring must be done by a qualified person(s) in
accordance with all applicable codes and standards. This range hood must be
properly grounded. Turn off electrical power at service entrance before wiring.
!
Installation – Mounting the Hood