Alto-Shaam 1200-TH/III Oven User Manual


 
TH/III InsTallaTIon/operaTIon/servIce manual pg. 9
INSTALLATION
Stacking Configurations
1000-TH/III with 1000-TH/III, 1000-SK/III, 1000-SK/II or 1000-S
750-TH/III with 750-TH/III, 750-TH-II, 750-S, 767-SK or 767-SK/III
500-TH/III with 500-TH/III, 500-TH-II or 500-S
STACKING INSTRUCTIONS
1) If the two appliances were shipped together from the factory, the top unit will have the casters
already removed. A stacking kit will be included with the shipment.
If casters need to be removed: lay the unit on its back, and remove the set screw on each caster. Pull the casters
out of the unit.
2) While appliance is laid on its back, insert one stacking post in each of the four corners of the
upper unit. Secure the stacking posts using one screw and two fl at washers that come with the
stacking kit.
Note: The  ange on the stacking posts must face the outside of the unit.
3) Remove the four top mounting screws from the lower unit. Place the upper appliance, which has
the stacking posts installed, on top of the bottom unit. Center the top unit from front to back.
Re-install the four screws through the fl ange of the four stacking posts.
CASTER SET SCREW
TOP
MOUNTING
SCREWS
STACKING
POSTS
TOP
MOUNTING
SCREWS