28
Installation and Service Check List
Boiler Model: _______________________ Serial No.: ____________________
Installation Date: ______________________
Installer Name: ________________________ Phone No.: ____________________
Boiler Installation
□
□
Boiler and burner wired per wiring diagram and National Electric Code? 120VAC wiring
Type_____ Size _____ AWG
Boiler level and in solid contact with floor?
Burner sealed to boiler? Mounting nuts tight? □
Space is large enough to provide required clearances? □
NFPA 31 Installation of Oil Burning Equipment followed? □
□
Local, state and national codes, laws, regulations and ordinances followed?
Vent System
□
New vent pipe installed and properly sealed?
Existing chimney and vent system inspected to NFPA 211 and in good condition?
□
□
Vent size checked against furnace manual and codes?
B r Operation urne
Burner Model: __________________ Nozzle: _______GPH _______Deg. ____Type_______ □
Burner Pump Pressure: ______________ □
Fuel filter and fuel lines installed and inspected as per burner manual? □
Air bled from oil piping? Piping checked for leaks? □
□
Burner started, adjusted and tested per burner manual?
Boiler Operation
□
Limit control tested for proper operation?
Thermostat heat anticipator set per burner manual instructions?
□
□
Boiler observed going through several operational cycles for proper operation?
Po nstallation st I
□ Reviewed owners’ information in this manual with owner or maintenance personnel and
instructed to keep for future reference?
□ Properly filled in and returned warranty registration card to Boyertown Furnace Co. Inserted
burner manual instructions with furnace manual for future us