Best UP271 Microwave Oven User Manual


 
- 8 -
7. PREPARE THE CABINET (CONT’D)
7.1 DUCTED INSTALLATION:
Cut-out the openings for
duct (A) and house
wiring (120 V AC)(B)
according to the direction
of discharge chosen.
See figures beside.
NOTE: For all UP27I Series
(internal blower)
range hoods, the
cut-out opening for
house wiring (120 V AC)
can be made in cabinet
bottom OR wall, no
matter the discharge
chosen (horizontal or
vertical).
L
C
B
2”
CABINET BOTTOM
2”
14”
7¼”7¼”
A
36”, 42” OR 48” INTERNAL BLOWER HOOD
HD0200A
L
C
B
Ø 1¼”
CABINET BOTTOM
13”
7¼”7¼”
3¾”
A
30” INTERNAL BLOWER HOOD
L
C
13”
30” INTERNAL BLOWER HOOD
Ø 1¼”
3¼”
B
3¾”
7¼” 7¼”
A
L
C
14”
36”, 42” OR 48” INTERNAL BLOWER HOOD
2”
2”
B
3¾”
7¼” 7¼”
A
½”
3¾”
½”
L
C
CABINET BOTTOM
9
5
8
5”
6¼”
HOOD WITH IN-LINE OR EXTERIOR BLOWER
3¼”
4
5
8
B
A
Ø 10”
¾”
10³
8
7.2 NON-DUCTED INSTALLATION: NON-DUCT KIT FLUE ANKUP SERIES
(ONLY FOR UP27I SERIES RANGE HOODS)
Refer to the installation sheet included with the non-duct kit for details.
8. PREPARE THE HOOD
8.1 UP27I SERIES RANGE HOOD (INTERNAL BLOWER)
VERTICAL DISCHARGE
Seal the metal shut-off plate on the back of the hood using duct tape.
HD0199
TOP OF HOOD
BACK OF HOOD