Blodgett SB-6E Electric Steamer User Manual


 
6
3.0 OPERATING INSTRUCTIONS
BOILER SECTION
Electrically powered steam generators are available with standard boiler controls or
ASME CSD-1 compliant controls. In addition to the ON/OFF power switch and indicator
pilot light on the standard controls, the CSD-1 controls come with four more indicator
pilot lights and a “Reset” switch. Follow the appropriate instructions for each.
Start-up Procedure, Standard Controls
1. Turn on water and power supply to appliance.
2. Close the manual blowdown valve if the units is not equipped with the optional
automatic blowdown valve.
3. Open door of cabinet and turn on Power Switch. Pilot light will come ON and water
will begin to enter boiler. Once water level has reached the proper operating level as
indicated on water gauge glass the heating elements will be energized and heat the
water. When steam pressure has reached 11 psi the elements will de-energize and
cycle on and off between 9 - 11 psi. The boiler is now ready for steam generation.
Start-up Procedure, CSD-1 Controls
1. Turn on water and power supply to appliance.
2. Close the manual blowdown valve if the units is not equipped with the optional
automatic blowdown valve.
3. Open cabinet door and turn "ON" power switch. The green pilot light will come "ON.”
Water will begin to enter the boiler. When enough water has entered the boiler the
(red) “Low Water” pilot will come on for approximately 10 seconds and then the
(amber) pilot light will come.
4. Press the “Reset” switch to begin boiler operation. The “Standby” pilot light will go off
and the boiler will begin operation. When steam pressure has reached 11 psi the
elements will de-energize and cycle on and off between 9 - 11 psi. The boiler is now
ready for steam generation.