INSTALLATION INSTRUCTIONS (continued)
NOTE: This equipment must be
installed to comply with
applicable federal, state and
local plumbing codes and
ordinances.
WARNING: ELECTRIC
SHOCK HAZARD
Brewer must be properly
grounded to prevent possible
shock hazard. DO NOT
assume a plumbing line will
provide such a ground.
Electrical shock will cause death
or serious injury.
IMPORTANT: Do not connect
brewer to electrical power until
the tank is filled with water.
Pour water into the pour-over
opening until water flows from
the brew head.
IMPORTANT:
Supply power must match
nameplate for voltage and
phase. Connecting to the
wrong voltage will damage the
brewer or result in decreased
performance. Such damage is
not covered by warranty.
NSF requires that the brewer be able to be moved for cleaning
underneath. A flex line or loops of copper tubing will satisfy this
requirement. See Figure 2 below.
In some areas, local codes require a backflow preventer (check
valve) to be installed on the inlet water line. If a backflow
preventer is used, you must install a water hammer arrester in
the incoming line, between the backflow preventer and the
brewer inlet, as far away from the brewer as space will allow.
This will relieve the excessive back pressures that can cause
faucet leaks and solenoid malfunctions.
ELECTRICIAN’S INSTALLATION INSTRUCTIONS
REFER TO ELECTRICAL SPECIFICATIONS - Page 1
Check the nameplate to determine correct electrical service
required for the Brewer to be installed.
IMPORTANT: Before connecting to electricity, make sure
automatic brewers are connected to the water supply.
Models 1080 and 1082 are equipped with a cord and plug. They
require a 115 - 125 volt 20 amp circuit (50/60 Hz, 2 wire plus
ground, with NEMA 5-15R or 5-20R Receptacle).
IMPORTANT: The ground prong of the plug is part of a system
designed to protect you from electrical shock in the event of
internal damage. Never cut off the ground prong nor twist a
blade to fit an existing receptacle. Contact a licensed electrician
to install the proper circuit and receptacle.
Models 1086 & 1088 must be wired by an electrician, and
require a 115/230V 20A circuit (50/60 Hz, 2 hot legs / 1 neutral
leg, plus ground). Remove front panel to gain access to terminal
block. Green terminal must be connected to a suitable building
ground. Circuit must be capable of 3500 Watts.
See figure 3 at right.
IMPORTANT: Wiring must be installed in approved solid or
flexible conduit, and must be secured to the brewer with a strain
relief (to be provided by the installer).
Fig. 3 115/230 Volt Terminal Block
Fig. 2 Water Supply Installation
5
642 75872 Owners Manual E.B.C. Airpot /Thermal