Bunn 428220001E Coffeemaker User Manual


 
Page 6
-1000 213.8 101.0 200 93.3
-500 212.9 100.5 200 93.3
0 212.0 100.0 200 93.3
500 211.1 99.5 200 93.3
1000 210.2 99.0 200 93.3
1500 209.3 98.5 200 93.3
2000 208.4 98.0 200 93.3
2500 207.4 97.4 200 93.3
3000 206.5 96.9 199 92.8
3500 205.6 96.4 198 92.2
4000 204.7 95.9 197 91.7
4500 203.8 95.4 196 91.1
5000 202.9 94.9 195 90.6
5500 201.9 94.4 195 90.6
6000 201.0 93.9 194 90.0
6500 200.1 93.4 193 89.4
7000 199.2 92.9 192 88.9
7500 198.3 92.4 191 88.3
8000 197.4 91.9 190 87.8
8500 196.5 91.4 189 87.2
9000 195.5 90.8 188 86.7
9500 194.6 90.3 187 86.1
10000 193.7 89.8 186 85.6
Brew water temperature is factory set at 200° F (93.3° C)
Areas of high altitude will require lowering this tempera-
ture to prevent boiling. This chart should be used as a
guide when readjusting the brew water temperature.
Altitude
(Feet)
Boiling point
of water
° F ° C
Recommended
water temperature
° F ° C
1. Install check valve. Refer to pictures on page 10.
2. Install clear brew chamber and empty brew cup. Lock
chamber in place.
3. Place an empty container that holds at least 20 ounces
under the brew chamber.
4. Connect the brewer to the power source.
5. Press the brew start switch. Water will flow into the brew
tank. Some excess water will flow into the container below
and the brew cup.
6. Wait approximately five minutes for the water in the tank to
heat to the proper temperature. Display will show "HEAT-
ING" until tank reaches it's operating temperature. Some
water will drip from the brew chamber during this time;
this is due to expansion and should not occur thereafter.
Any excess water in the brew chamber will be automati-
cally purged at the end of the initial setup.
7. Water volumes and flow settings have been preset at the
factory. Refer to "Adjusting Brewing Parameters" section
of this manual should the volume need to be increased
or decreased.
8. The brewer is now ready for use in accordance with the
instructions for Coffee Brewing.
NOTE: If brewer has been drained/moved, perform "Reset to
first time" procedure on page 11.
INITIAL SET-UP
(-)/NO
PROGRAM/SELECT
(+)/YES
BREW START
Press again to cancel.
OPERATING CONTROLS
RINSE
Press this button to
rinse brew chamber
after each brew cycle.
42822.1 110411