Page 5
MODELS W/OUT FAUCET
Models CRT5, CRT5A & CRT5B
1. Remove the shipping cap from the bulkhead
fitting on the rear of the brewer.
2. Attach the flare fitting from the short piece of
tubing on the flow control (supplied) to the water
inlet fitting at the rear of the brewer.
3. Flush the water line and securely attach it to the
flare fitting on the strainer/flow control.
4. Turn on the water supply.
Models CRTF5, CRTF5A & CRTF5B
1. Remove the shipping caps from the bulkhead
fittings on the rear of the brewer.
2. Attach the flare fitting from the short piece of
tubing on the flow control (supplied) to the lower
water inlet fitting at the rear of the brewer.
3. Attach the flare fitting from the short piece of
tubing on the tee (supplied) to the upper water
inlet fitting at the rear of the brewer.
4. Flush the water supply line and securely attach it
to the flare fitting on the tee.
5. Turn on the water supply.
6. Place an empty vessel beneath the faucet and lift
the handle until water is dispensed.
PLUMBING REQUIREMENTS (cont.)
MODELS W/FAUCET & EXTERNAL
FLOW CONTROL
MODELS W/FAUCET & INTERNAL
FLOW CONTROL
Models CRTF5 & CRTF5B
1 Remove shipping caps from the bulkhead fittings
on the rear of the brewer.
2. Attach the female flare fitting on the tube from the
needle valve to the upper fitting on the rear of the
brewer and the female flare fitting on the manifold
to the lower fitting on the rear of the brewer.
3 Flush the water supply line and securely attach it to
the male flare fitting on the manifold.
4. Turn on the water supply.
5. Place an empty vessel beneath the faucet and lift
the handle until water is dispensed.
10478 011597
P2188
P2187