Bunn JDF-4S Beverage Dispenser User Manual


 
31
1. Install door cover by first plugging the
door harness connector into the machine
harness connector located at the bottom
of the machine door.
2. Install door cover. 3. Secure the door cover using 5 screws
provided.
4. Place refrigeration switch in the OFF po-
sition.
5. Connect water supply to machine. (See
Plumbing Requirements)
6. Connect power supply to machine. (See
Electrical Requirements)
7. Install bath tank fill tube over a nozzle as
shown.(See Initial Fill)
8. Place the program switch in the ON po-
sition.
9. Hold the dispense switch until water be-
gins to flow into the tank (approx. 10 sec-
onds). When tank is full, water will begin
pour out of the overflow tube, Press the
dispense button to stop the flow of water.
10. Place the refrigeration switch in the
ON position and the program switch in the
OFF position.
11. Insert juice containers as shown.
12. Proceed to page 7 in the Operating and
Installation manual for calibration instruc-
tions and charts.
QUICK SETUP GUIDE - JDF-2S and JDF-4S (JDF-2S shown)
P3577
P3578 P3579
P3588
P3591
P3582
P3589
44744.2 062912