Bunn U3 U3A Coffeemaker User Manual


 
Page 5
INITIAL SETUP
CAUTION - The brewer must be disconnected from the power source throughout the initial setup, except when
specified in the instructions.
IMPORTANT: Brewer must be level and installed on a sturdy structure.
Electrician's and Plumber's Instructions are provided. These instructions should be carefully
followed before proceeding with initial setup.
Be sure all electrical and plumbing connections are tight.
1. Open manual fill valve located on the bottom of the brewer. Water should start filling the tank. When water is
visible in the hot water gauge glass (center spigot), close valve. Approximate time for filling manually is 3
minutes.
CAUTION: Never leave brewer unattended while manually filling tank.
2. Connect the brewer to the power source. Turn "ON/OFF" switch to the "ON" position. Water should finish filling
tank automatically.
NOTE: It is recommended that the "ON/OFF" switch be left in the "OFF" position at the end of the operating day or
when unattended for a long period of time.
3. Disconnect the brewer from the power source. Remove front cupola cover for access to thermostat knob and
timer. On some brewers the thermostat knob is located on the front of the cupola cover.
4. Turn the thermostat knob clockwise to an approximate 5 o'clock position. Allow 1-1/2 hours for water to heat.
Time will vary with incoming water temperature.
5. On initial warm-up, some water may flow thru the overflow spigot due to expansion of the cold water in the
tank. This will not recur during the use of the brewer and may be avoided on the initial warm-up by drawing
off 1/2 gallon decanters of water each 15 minutes till brewing temperature is reached.
6. If plumbing is to be hooked up later be sure the brewer is disconnected from the power source. If plumbing
has been hooked up, the brewer is ready for
Initial Setup
.
NOTE: Schematic wiring diagrams are included in this manual.
PLUMBING REQUIREMENTS
These brewers must be connected to a cold water system with operating pressure between 20 (138) and 90 psi
(620 kPa) from a 1/2" or larger supply line. A shut-off valve should be installed in the line before the brewer. Install
a regulator in the line when pressure is greater than 90 psi (620 kPa) to reduce it to 50 psi (345 kPa). The water
inlet fitting is 3/8" flare.
NOTE - Bunn-O-Matic recommends 3/8" copper tubing for installations from the 1/2" water supply line. A tight
coil of copper tubing in the water line will facilitate moving the brewer to clean the countertop. Bunn-O-Matic does
not recommend the use of a saddle valve to install the brewer. The size and shape of the hole made in the supply
line by this type of device may restrict water flow.
This equipment must be installed to comply with the Basic Plumbing Code of the Building
Officials and Code Administrators International, Inc. (BOCA) and the Food Service Sanitation
Manual of the Food and Drug Administration (FDA).
ELECTRICAL INSTALLATION INSTRUCTIONS (CONT.)
10060 080900