Bunn Ultra 2 Espresso Maker User Manual


 
13
1. Install the seal(s) over the
flange at the rear of the cooling
drum(s) and press the seal(s)
firmly into place as shown.
2. Align the auger shaft(s) with the
auger(s). Push the auger(s) as
far as they will go and rotate so
the flat face of the auger shaft
is aligned with the flat face of
the auger nose.
4. Thoroughly rinse the hopper(s)
and install over the auger(s)
and cooling drum(s).
6. Set the lids on the hopper(s)
and plug in the hopper lid lamp
cord(s).
10. Assemble the drip tray.
8. Slide the faucet valve assembly
into place on the hopper.
9. Press down on the valve to
compress the spring. Position
the faucet handle over the fau-
cet valve one side at a time and
snap into place on the hopper.
7. Position the faucet seal and re-
turn spring in the faucet valve.
5. Slide into place and push down
until the hopper lock plunger(s)
snap into place.
ASSEMBLY FOLLOWING CLEANING
3. Install auger nose bushing into
inside front of hopper.
40563 110207