11
Installation
TOOLS NEEDED FOR INSTALLATION
Phillips screwdriver
Measuring tape
Level
Drill with 1/16” drill bit
STEAM BARRIER INSTALLATION
Position the steam barrier inside the top of the cut-out. Push it towards the
back wall until the back edge lines up with the back of the cabinet.
Attach it with the eight (8) provided screws.
•
•
•
•
•
•
Steam Barrier
(provided)