12
Installation
INSTALLATION PLANNING
A qualified installer must complete the installation of this built-in appliance. Proper
installation is your responsibility.
Carefully check the location where the hood is to be installed. The hood should be
placed for convenient access. Make certain that electrical power can be provided
in the selected location.
Plan the installation so that all minimum clearances are met or exceeded.
Dimensions shown provide minimum clearances, unless otherwise noted.
Make certain that you have everything necessary to ensure a proper
installation before proceeding.