818 18 12-00/2 21
Prior to Initial Start-Up
1
Before connecting the appliance to the mains and putting it into ope-
ration for the first time, leave the appliance to stand for 30 minutes if
was transported upright. After transport on its side, the appliance must
be left to stand for 2 hours before putting it into operation. This is
necessary to allow the oil to flow back into the compressor. Otherwise
the compressor may be damaged.
0 1. Please clean the appliance interior and all accessories prior to initial
start-up (see section: "Maintenance and Cleaning").
2. Remove the cold accumulation block from the freezer tray.
3. Place the cold accumulation block into a compartment or drawer only
after the optimal storage temperature of -18 °C has been reached, and
allow to freeze.
4. After 24 hours place the cold accumulation block in the freezer tray or
in the front of the upper drawer.
5. Re-freeze the thawed cold accumulation block in the same fashion, e.g.
after cleaning the appliance.