Emerson 1.5 TO 10 TONS, 60HZ Refrigerator User Manual


 
Maintenance
5
5.0 MAINTENANCE
Periodic preventive maintenance should include a monthly manual switchover to ensure that the sys-
tem operates properly.
Figure 1 General piping arrangement—Envirosource standby pump and cooling module with
Process Fluid Chiller 1-1/2 to 5 ton air cooled models