Checklist for Proper Installation
18
6.0 CHECKLIST FOR PROPER INSTALLATION
___ 1. Liebert XDCF modules are securely attached to the cabinet.
___ 2. Piping from Liebert XDP or Liebert XDC, with isolation valves, properly connected to each
Liebert XDCF module.
___ 3. Flex piping connections to prefabricated header assembly are secure and according to
specifications.
___ 4. Check the R-134a refrigerant charge.
___ 5. System checked for leakage.
___ 6. Run system and verify that the Liebert XDP or Liebert XDC and the Liebert XDCF modules
operate properly.
___ 7. Piping is insulated.