Franke Consumer Products FCR 708-H TC Ventilation Hood User Manual


 
EN
5
5
650 mm min
11a
658
442 275
250
230230
Rear air outlet
zone
INSTALLATION
Boring the wall
If you want to use the hood in suction version with the air outlet at the back of the hood, make
sure to follow the indications given below in the drawing for a correct boring operation of the air
outlet opening.
When installing the hood in recycling version it has to be taken into consideration that space re-
maining between the hood and the upper limit (ceiling or self) is at least 8-10 cm.
On the wall, trace:
• a vertical line up to the ceiling or top limit, at the centre of the area where you intend to fit
the hood;
a horizontal line at: 650 mm min. above the cooking hob;
As shown, mark a reference point at 658 mm above the horizontal reference line, and at 230
mm to the right of the vertical reference line.
Repeat this operation on the opposite side, checking levelling.
Drill the points marked using a ø 12 mm bit
Insert plugs with screws and brackets 11a in the holes then tighten them.