HEATED PASS THROUGH
INSTALLATION, OPERATION, SERVICE, AND PARTS
2
Power Requirements:
• Voltage – 208 VAC
• Frequency - 60 Hz
• Single Phase
• 20 amp Service
4. Operation
1. Plug the unit into the power source. *
2. Press the ON/OFF rocker switch to the ON
position.
3. Place product in the HPT in accordance with the
restaurant’s established procedures.
THIS APPLIANCE IS EQUIPPED WITH
A GROUNDING PLUG FOR YOUR
PROTECTION AGAINST SHOCK
HAZARD AND MUST BE PLUGGED
INTO A PROPERLY GROUNDED
RECEPTACLE. DO NOT CUT OR
REMOVE THE GROUNDING
PRONG.FROM THIS PLUG.
Air Tower
ON/OFF
Switch
Cowl
Plate
Power Cord
Heated air flows
from the air tower
across the plate
and into the cowl.
Blower
Plate
Air flow through the HPT