GE 25 Refrigerator User Manual


 
BEFORE YOU BEGIN
Read these instructions completely
and carefully.
IMPORTANT Save these instructions
for local inspector’s use.
IMPORTANT
Observe all governing
codes and ordinances.
Note to Installer – Be sure to leave these
instructions with the Consumer.
Note to Consumer – Keep these instructions
for future reference.
Skill level – Installation of this appliance requires
basic mechanical skills.
Completion time – Refrigerator Installation
30 minutes
Water Line Installation
30 minutes
Proper installation is the responsibility of
the installer.
Product failure due to improper installation is not
covered under the Warranty.
If the refrigerator has already been installed,
remove the base grille (see Step 2 in Moving
the Refrigerator), then skip to Step 5 in Installing
the Refrigerator.
Questions? Call 800.GE.CARES (800.432.2737) or Visit our Website at: ge.com
In Canada, call 1.800.561.3344 or Visit our Website at: geappliances.ca
Installation
Refrigerator
Instructions
Models 23, 25 & 26
If the refrigerator has an icemaker, it will have
to be connected to a cold water line. A GE water
supply kit (containing tubing, shutoff valve, fittings
and instructions) is available at extra cost from your
dealer, by visiting our Website at ge.com (in Canada
at geappliances.ca) or from Parts and Accessories,
800.626.2002 (in Canada 1.888.261.3055).
PREPARATION
WATER SUPPLY TO THE ICEMAKER
TOOLS YOU WILL NEED
23
Phillips Head Screwdriver
3/8and 5/16Socket 1/2and 7/16Wrench
Plastic Putty Knife
1/8Hex Wrench