GE SCB1000 Microwave Oven User Manual


 
5
Installation Preparation
ELECTRICAL REQUIREMENTS
Single Advantium 120 Installation:
This product requires a 120 volt, 60 Hz, 15 amp circuit
and draws 1.8 kilowatts. This product must be connected
to a supply circuit of the proper voltage and frequency.
• Wire size must conform to the requirements of the
National Electrical Code or the prevailing local code for
this kilowatt rating.
• The power supply cord and plug should be brought to a
separate 15 or 20 ampere branch circuit single
grounded receptacle. The outlet box should be located
within reach of the 48" power cord.
ELECTRICAL LOCATION
IMPORTANT: (Please read carefully).
The power cord of this appliance is equipped with a
three-prong (grounding) plug that mates with a standard
three-prong grounding wall receptacle to minimize the
possibility of electric shock. The customer should have
the wall receptacle and circuit checked by a qualified
electrician to make sure the receptacle is properly
grounded and has the correct polarity.
• Where a standard two-prong wall receptacle is
encountered, it is the personal responsibility and
obligation of the customer to have it replaced with a
properly grounded three-prong wall receptacle.
Do not, under any circumstances, cut or remove the third
(ground) prong from the power cord.
DO NOT USE AN EXTENSION CORD.