GE ZV800 Ventilation Hood User Manual


 
10
Installation Instructions
INSTALL DUCT BRACKET
The duct bracket must be intalled against the ceiling.
This bracket will hold the duct cover in place at the top.
Secure the bracket to the ceiling and wall:
Align the marked centerline on the bracket with the
centerline on the wall.
Mark the 2 screw hole locations in the ceiling.
Drill 1/8” plot holes in the marked locations.
If pilot holes do not enter studs, enlarge the holes
to 3/8” and install wall fastener anchors.
Drive screws, by hand, into the fasteners to allow
anchors to expand. Remove the screws.
Secure the bracket to the ceiling and wall with
wood screws and/or fasteners.
3
INSTALL MOUNTING BRACKET
This vent hood must be secured to the horizontal
support or wall studs.
• With the template taped in place, use a punch to
mark all mounting screw locations.
Drill 1/8” pilot holes at the 6 punched locations.
Remove the template.
The 2 holes in the support bracket holes must enter
studs or the horizontal support.
Use wood screws to secure the mounting bracket
to the wall. The screws must engage wall studs or
the installed horizontal mounting support.
Check to be sure that the bracket is level. There is
no way to level the hood after hanging it from this
bracket.
2
C
L
WALL-MOUNTED INSTALLATIONVENTED TO THE OUTSIDE