Heatcraft Refrigeration Products H-IM-FL1A Refrigerator User Manual


 
21
System Reference Data
The following information should be filled out and signed by Refrigeration Installation Contractor at time of start-up.
Date System Installed: _____________________________________________________
Installer and Address: _____________________________________________________
_____________________________________________________
_____________________________________________________
Condensing Unit Unit Model#: ________________________________________
Unit Serial #: ________________________________________
Compressor Model #: ____________________ Compressor Model #: _________________
Compressor Serial #: ____________________ Compressor Serial #: __________________
Electrical _________________ Volts __________________ Phase _______
Voltage at Compressor L1__________ L2 ___________ L3 ___________
Amperage at Compressor L1__________ L2 ___________ L3 ___________
Service Record
A permanent data sheet should be prepared on each
refrigeration system at an installation, with a copy for the owner
and the original for the installing contractorʼ s files.
If another firm is to handle service and maintenance, additional
copies should be prepared as necessary.